Road Committee

Galien Township Road Committee

Your Township Road Tax dollars go fully towards the Secondary Road Projects listed below:

List of road work for 2023/2024

-Prime and Double Sealcoat Buffalo Rd (Secondary) between Mt. Zion and Andrews


-Prime and Double Sealcoat - All Primaries

Second St - Pardee to Village Limits

Buffalo Rd - Hampton to Beaver Dam

Beaver Dam - Buffalo to Olive Branch

Hudson Lake Rd

Olive Branch - Nye to Beaver Dam


***Your patience during these projects is greatly appreciated.  We recognize this is an inconvenience for those impacted, but this is necessary to improve our infrastructure***

------------------------------------------------------------

List of road work for 2022

-Sealcoat Mt. Zion (Secondary) between U.S. 12 and Buffalo

-Sealcoat Olive Branch (Secondary) between Andrews and Township Line

List of road work for 2021

-Reconstruction of Buffalo Road (Secondary) between Nye and Hampton

List of road work completed in 2020

-Repave Cleveland (Primary) north of Village limit to Elm Valley

-Sealcoat Rickerman (Seconday) between U.S. 12 and Buffalo

-Sealcoat Pardee (Secondary) between Buffalo and Olive Branch

-Sealcoat Buffalo (Secondary) between Cleveland and Nye

-Chloride dust control on gravel roads 

List of road work completed in 2019

-Chloride dust control on gravel roads 

List of road work completed in 2018

-Reconstruction of Hampton Road (Primary) between U.S. 12 and Buffalo

-Reconstruction of Mt. Zion (Secondary) between U.S. 12 and Buffalo

-Sealcoat Second Street (Secondary) east of Gardner

-Reconstruction of Olive Branch (Secondary) between Andrews and Township Line

-Replacement of Nye Bridge over Dowling Creek

-Chloride dust control on gravel roads 

List of road work completed in 2017

-Reconstruction of Olive Branch (Primary) between Cleveland and Nye

-Sealcoat Olive Branch (Secondary) between Cleveland and Andrews

-Sealcoat Cleveland (Primary) between State Line and Village limits

-Sealcoat Nye (Secondary) between State Line and Olive Branch

-Add gravel to Nye (Secondary) between U.S. 12 and Buffalo

-Chloride dust control on gravel roads. 

List of road work completed in 2016

-Reconstruction of Pardee Road (Secondary) between Buffalo and Olive Branch

-Reconstruction of Pardee Road (Primary) between Second St. and Kruger

-Reconstruction of Buffalo Road (Secondary) between Cleveland and Nye. 

-Sealcoat Gardner (Secondary) between U.S 12 and Galien-Buchanan.

-Sealcoat Pardee (Secondary) between U.S 12 and Second St.

-Replacement of bridge deck on Olive Branch at Bertrand Twp line.

-Chloride dust control on gravel roads 

List of road work completed in 2015

-Reconstruction of Rickerman (Secondary) between U.S. 12 and Buffalo.

-Chloride dust control on gravel roads 



More about The Galien Township Road Committee:

The mission of the Galien Township Road Advisory Committee is to work in concert with the Berrien County Road Department to seek continuous improvement to our Township road system, as effectively as possible, to enhance the lives of our residents.

The Committee was formed in September 2015 and meets as necessary.  The following individuals currently serve on this Committee on a voluntary basis:

Mr. Tim Richter - Chairperson

Mr. Jim Trapp - Community Representative

Mrs. Leann Carpenter - Community Representative



Pictured on this page - Rickerman Road on Fall Day after Reconstruction